Home > Products > Packer Accessories > Y-Tool
Y-Tool

The Y-Tool is designed to be run with ESP below ESP packer. As the produced fluid leaves the ESP it flows through a pump sub and then joins the main production string through the Y-Tool profile that has been carefully designed to minimize flow erosion. The Y-Tool offsets the ESP in the well to provide a straight line conduit for wireline or coiled tubing tools to bypass the ESP. The Y-Tool has an upper connection for the production tubing and two lower connections, one for the ESP and the other for the bypass. A blanking plug is located in the bypass side in a special nipple to prevent recirculation of the pumped fluid. The blanking plug is removed prior to and after intervention. For logging operations, the blanking plug is replaced by a logging plug which allows real time or memory logging to be conducted whilst the pump is operating. 




Features and Benefits


  Large flow area

  Minimize flow erosion

  Simple design

  Standard 2 3/8”, 2 7/8” and 3 1/2” sizes









PRODUCTS
Dissolvable Frac Plugs
Packers
Packer Accessories
Flow Control Tools
Safety Valve
Multi-Stage Frac System
Anti-wear Protector
ABOUT US
Company Profile
API Certificates
CONTACT US

Tel: +86 139 2462 6365

Email:  george.chang@petrostartools.com

Add: 1300 Post Oak Blvd Suite 770,Houston, TX 77056 USA


© 2021 Petrostar Tools and Services Inc. All rights reserved.