The Y-Tool is designed to be run with ESP below ESP packer. As the produced fluid leaves the ESP it flows through a pump sub and then joins the main production string through the Y-Tool profile that has been carefully designed to minimize flow erosion. The Y-Tool offsets the ESP in the well to provide a straight line conduit for wireline or coiled tubing tools to bypass the ESP. The Y-Tool has an upper connection for the production tubing and two lower connections, one for the ESP and the other for the bypass. A blanking plug is located in the bypass side in a special nipple to prevent recirculation of the pumped fluid. The blanking plug is removed prior to and after intervention. For logging operations, the blanking plug is replaced by a logging plug which allows real time or memory logging to be conducted whilst the pump is operating.
Features and Benefits
● Large flow area
● Minimize flow erosion
● Simple design
● Standard 2 3/8”, 2 7/8” and 3 1/2” sizes
Tel: +86 139 2462 6365
Email: george.chang@petrostartools.com
Add: 1300 Post Oak Blvd Suite 770,Houston, TX 77056 USA
© 2021 Petrostar Tools and Services Inc. All rights reserved.